mobile demilitarization plant for 100 mm ammo

Please Download Product Datasheet

Designed specifically for demilitarization project of 1 million rounds of cal. 100MM tank ammo

  • Operated in field conditions
  • Nominal capacity: 60 – 72 rounds per hour
  • Operated for 2 shifts a day

Currently installed technologies

bunker Ammo
Ammo
Ammo
scheme

Disassembly unit A - D

  • A2/A3: ammo degreasing and putting on conveyor
  • A4: machinery room
  • B1: preparation room for defuzing/depriming
  • B2: bunker for defuzing/depriming operation
  • C1: conveyor with integrated pull-away machine
  • D1: shipping projectile and cartridge case

Processing units (separate)

  • E1/E2: gun propellant recovery from cartridge cases
  • T1-T4: TNT melt-out station (control room, steam generator, melt-out units)

Storage magazines (separate)

Marcel Hanus
OZM Research s.r.o.
Phone.: +420 608 746 932
E-mail: hanus(at)ozm.cz

 
 
» demilitarization technologies » mobile demilitarization plant for 100 mm ammo